Gantry crane lift plan8/27/2023 Gantry crane installation process can be divided into two parts, the installation of the legs, the installation of the main lifting beam and the installation of the lifting trolley. The truck crane as lifting equipment, truck crane according to the actual needs of the arrangement, the span and tonnage when the need to use two, the span is small and a single girder gantry crane can be selected for lifting.Before installing the gantry crane, do a good job of personnel division of labor configuration, site cleanup, set up obvious construction signs to ensure that the construction can be carried out normally.Ready for a variety of materials needed (various tools such as: wrenches, pry bars, vise, etc.), apparatus (a variety of equipment such as: welding machine, gas cutting tools, etc.) to prepare and check.Before the installation of gantry cranes should be to the scene to survey the site and analyze the measured data, and develop a proper crane installation program, so that the gantry crane installation work can be carried out smoothly. ![]() Gantry crane installation before the preparation work : ![]() ![]() There are three main steps to install a gantry crane.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |